080830011 BNSF Mississippi East River bridge project on Wayzata Sub.
Cantilever work platforms surround the bridge piers. Utility pipe on side of bridge girder has been cut at girder joints.
Date:
8/30/2008
Location:
Minneapolis, MN
Map
Views:
86
Collection Of:
The Slidebroker image by John Hill
Author:
John Hill
Picture Categories: Bridge,Track
This picture is part of album:
2008 Twin Cities Trackwork Projects
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=1301116