This bridge was buhlt to the super elevation. Rare to see. The new beam is level. Ballast will put in the new super elevation. |
Date:
3/16/2008 |
Location:
Vincennes, IN Map  |
Views:
192 |
Collection Of:

Brian Vieck |
|
Author: Brian Vieck
|
 |
Picture Categories: |
This picture is part of album: Replacing a bridge on CSX |