After a couple hours of hand digging we had 3 or 4 of the dozen ties installed. With the back-hoe running the rest were installed in an hour or two. /DL |
Date:
11/27/2009 |
Location:
Walkersville, MD Map ![Show Walkersville on a rail map](/images/map_us.gif) |
Views:
136 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
David Larrabee |
|
Author: David Larrabee
|
![Replacing ties in the yard run-around](http://s3.amazonaws.com/rrpa_photos/50700/2009%2011%2027%20WSRR%20Backhoe%20Tie%20Inserter%20001%20(2).JPG) |
Picture Categories: Yard,Track |
This picture is part of album: Fall 2009 at Ualkersville |