Train PR2 on Amtrak's Northeast Corridor heading down probably to switch out the Providence Journal as the boy's are still unloading steel in back of me at Pawtucket Yards. The other track is out of service between Boston Switch and Lawn Tower because of the track construction at Pawtucket Depot |