3rd Rail Project         
On the other side of Sacred Heart Avenue, removed panel track stacked, dozer pushing stone, lowering the grade. Temporary swich on the lower left joining the Providence and Worcester to the Amtrak Northeast Corridor
Date: 8/5/2006 Location: Central Falls, RI   Map Show Central Falls on a rail map Views: 256 Collection Of:   Ron Chouinard
Author:  Ron Chouinard
3rd Rail Project
Picture Categories: This picture is part of album:  Amtrak and the Northeast Corridor
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=460270