Some track work is needed, and equipment is already on site.  Contributor's Pick!       
Tracks 1 & 2 were where the grass is, the westbound was on the ballast, the eastbound is what curves toward the former 5 track and 6 track is parallel to 5. The eastbound ends before Main St.
Date: 6/3/2017 Location: Rittman, OH   Map Show Rittman on a rail map Views: 159 Collection Of:   Fred Stuckmann
Author:  Fred Stuckmann
Some track work is needed, and equipment is already on site.
Picture Categories: Track This picture is part of album:  A look around.
Share
User Comments
Name Type Comments Date
Mike Maskel General NICE SHOT AND CATCH 6/17/2017 12:23:37 PM
Jim Ford General Scary. 6/17/2017 5:52:26 PM
Robert Farkas General How sad!!! 6/18/2017 10:03:56 PM
Steve Coraggio General Sad, seems no logical thinking went into this. 6/22/2017 10:02:54 AM
Fred Stuckmann General I agree. Thank you. 6/22/2017 4:58:49 PM

Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4735685