071101008 CP/SOO bridge replacement project over BNSF Northtown CTC 35th
Temporary switch for bypass has been removed and both mains are severed today as tracks are finally spliced back into original configuration. This signals the end is very close for the bridge project.
Date:
11/1/2007
Location:
Minneapolis, MN
Map
Views:
195
Collection Of:
The Slidebroker image by John Hill
Author:
John Hill
Picture Categories: Bridge
This picture is part of album:
2007 SOO Bridge Replacement Project at BNSF Northtown Yard
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=938017